← The Wenatchee Wire
Infrastructure

I-90 lane closures Tuesday through Wednesday

🔊 Listen · narrated by Aiden

Eastbound I-90 from milepost 90 to 93 near Cle Elum will have double right-lane closures Tuesday, Oct. 13, at 6 a.m. through Wednesday, Oct. 14, until 4 p.m. for routine roadwork. The closures are scheduled for Tuesday, Oct. 13, through Thursday, Oct. 15, on SR 153 north of Pateros for routine bridge inspections.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported · 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗

  • ✓
    I-90 lane closures Tuesday through Wednesday“090 [30 mi from Wenatchee]: Eastbound I-90 (milepost 90 to 93) near Cle Elum. Beginning Tuesday, Oct. 13 at 6 a.m. through Wednesday, Oct. 14 until 4 p.m. there will be a double right-lane closure for routine roadwork.”
  • ✓
    Eastbound I-90 lane closures near Cle Elum begin Tuesday, Oct. 13, for routine roadwork.“090 [30 mi from Wenatchee]: Eastbound I-90 (milepost 90 to 93) near Cle Elum. Beginning Tuesday, Oct. 13 at 6 a.m. through Wednesday, Oct. 14 until 4 p.m. there will be a double right-lane closure for routine roadwork.”
  • ✓
    Eastbound I-90 from milepost 90 to 93 near Cle Elum will have double right-lane closures Tuesday, Oct. 13, at 6 a.m. through Wednesday, Oct. 14, until 4 p.m. for routine roadwork. The closures are scheduled for Tuesday, Oct. 13, through Thursday, Oct. 15, on SR 153 north of Pateros for routine bridge inspections.“090 [30 mi from Wenatchee]: Eastbound I-90 (milepost 90 to 93) near Cle Elum. Beginning Tuesday, Oct. 13 at 6 a.m. through Wednesday, Oct. 14 until 4 p.m. there will be a double right-lane closure for routine roadwork.”
Source text saved for this check (2026-10-14T06:47:15.515Z)
WSDOT highway construction and road closures within 50 miles of Wenatchee — 10/13/2026:

090 [30 mi from Wenatchee]: Eastbound I-90 (milepost 90 to 93) near Cle Elum. Beginning Tuesday, Oct. 13 at 6 a.m. through Wednesday, Oct. 14 until 4 p.m. there will be a double right-lane closure for routine roadwork.
Effective: Oct 13, 2026, 12:07 AM
Expected end: Oct 14, 2026, 4:00 PM

090 [36 mi from Wenatchee]: Vantage Bridge milepost 136 to 138 both directions: There are single-lane closures, reduced speeds and 9-ft width restrictions in place 24/7 until further notice. Eastbound width restriction begins at Exit 110, the junction of I-82 near Ellensburg. Westbound width restriction begins at Exit 149 the junction of SR 281 near George.
Effective: Oct 26, 2025, 6:00 PM

153 [48 mi from Wenatchee]: Single lane alternating traffic on various sections of SR 153 north of Pateros from 7 a.m. to 3 p.m. Tuesday, Oct. 13 through Thursday, Oct. 15 for routine bridge inspections.
Effective: Oct 9, 2026, 5:31 PM
Expected end: Oct 15, 2026, 5:31 PM

The Wenatchee Wire is free. Get Wenatchee's news delivered every morning.