Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
SR 291 is closed in both directions between Assembly Street milepost 3 and Swenson Road milepost 13β291: Closure on SR 291 both directions between Assembly Street milepost 3 and Swenson Rd milepost 13 due to a wildfire. Use a safe alternate route. Beginning at 8:54 pm on August 1, 2026 until further notice.β
- β
The closure is due to a wildfireβ291: Closure on SR 291 both directions between Assembly Street milepost 3 and Swenson Rd milepost 13 due to a wildfire. Use a safe alternate route. Beginning at 8:54 pm on August 1, 2026 until further notice.β
- β
The closure began on August 1 at 8:54 p.m.β291: Closure on SR 291 both directions between Assembly Street milepost 3 and Swenson Rd milepost 13 due to a wildfire. Use a safe alternate route. Beginning at 8:54 pm on August 1, 2026 until further notice.
Effective: Aug 1, 2026, 8:54 PMβ
- β
WSDOT advises using a safe alternate routeβUse a safe alternate route.β
- β
Multiple I-405 closures are scheduled for August 3-10β405: The North 30th Street on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.
Effective: Jul 31, 2026, 12:00 AM
Expected end: Aug 10, 2026, 4:00 AM
405: Southbound I-405 off-ramps to eastbound/westbound I-90 (Exit 11) will be closed overnight from 11:30 p.m. Monday, August 3, to 4:30 a.m. Tuesday, August 4. A signed detour route will be in place.
Effective: Jul 31, 2026, 12:00 AM
Expected end: Aug 4, 2026, 4:30 AM
405: The 112th Avenue Southeast on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.
Effective: Jul 31, 2026, 12:00 AM
Expected end: Aug 10, 2026, 11:30 PMβ
- β
Overnight off-ramp closures at Exit 11 are scheduled for August 3-10No usable supporting receipt β unverified.
- β
Full ramp closures on I-405 are scheduled for August 7-10β405: The North 30th Street on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.
Effective: Jul 31, 2026, 12:00 AM
Expected end: Aug 10, 2026, 4:00 AM
405: The 112th Avenue Southeast on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.
Effective: Jul 31, 2026, 12:00 AM
Expected end: Aug 10, 2026, 11:30 PMβ
- β
The 112th Avenue Southeast on-ramp to northbound I-435 will close from 11:30 p.m. Friday, August 7β405: The 112th Avenue Southeast on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.β
- β
The 112th Avenue Southeast on-ramp to northbound I-405 will close through 4 a.m. Monday, August 10β405: The 112th Avenue Southeast on-ramp to northbound I-405 will be fully closed day and night, 11:30 p.m. Friday, Aug. 7 β 4 a.m. Monday, Aug. 10. Signed detours will be in place.β
- β
A signed detour will be in place for all closuresNo usable supporting receipt β unverified.
- β
The Vaughn Hubbard Bridge near Pasco has ongoing single-lane closuresβ012: Both directions milepost 295 Vaughn Hubbard Bridge near Pasco. There will be single-lane closures, reduced speeds, and a 20-ft width restriction for bridge work, until further notice.β
- β
The Vaughn Hubbard Bridge near Pasco has reduced speedsβ012: Both directions milepost 295 Vaughn Hubbard Bridge near Pasco. There will be single-lane closures, reduced speeds, and a 20-ft width restriction for bridge work, until further notice.β
- β
The Vaughn Hubbard Bridge near Pasco has a 20-foot width restrictionβ012: Both directions milepost 295 Vaughn Hubbard Bridge near Pasco. There will be single-lane closures, reduced speeds, and a 20-ft width restriction for bridge work, until further notice.β
- β
The Vaughn Hubbard Bridge near Pasco has ongoing closures due to bridge workβ012: Both directions milepost 295 Vaughn Hubbard Bridge near Pasco. There will be single-lane closures, reduced speeds, and a 20-ft width restriction for bridge work, until further notice.β
- β
A closure on SR 526 will affect the eastbound on-ramp from Seaway Boulevardβ526: From 8:30 to 11:30 a.m. Friday, Aug. 7, the left lane of the eastbound State Route 526 on-ramp from Seaway Boulevard (milepost 2) will close for maintenance.β
- β
The eastbound on-ramp from Seaway Boulevard on SR 526 will close from 8:30 to 11:30 a.m. on August 7β526: From 8:30 to 11:30 a.m. Friday, Aug. 7, the left lane of the eastbound State Route 526 on-ramp from Seaway Boulevard (milepost 2) will close for maintenance.β
- β
The closure on SR 526 is for maintenanceβ526: From 8:30 to 11:30 a.m. Friday, Aug. 7, the left lane of the eastbound State Route 526 on-ramp from Seaway Boulevard (milepost 2) will close for maintenance.β