← The Wenatchee Wire
Infrastructure

Wenatchee roadwork affects multiple routes

πŸ”Š Listen Β· narrated by Aiden

WSDOT will close the northbound I-5 off-ramp to Southcenter Parkway from 9 p.m. Monday, Aug. 10, through 5 a.m. Friday, Aug. 14. The southbound off-ramp will remain open during this time.

Starting Aug. 17, both directions of SR 169 will close for 35 days between Southeast 332nd Street and Plass Road for fish barrier removal. Local access and business access will remain open during the closure. Detours will be signed for drivers.

The I-405 closure from 11:30 p.m. Friday, Aug. 7, to 4 a.m. Monday, Aug. 10, is already underway. SR 96 will alternate traffic with flaggers from 7 a.m. to 2 p.m. Monday through Friday, Aug. 10–14, for utility work.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts7 of 10 claims supported Β· 70%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    WSDOT will close the northbound I-5 off-ramp to Southcenter Parkway from 9 p.m. Monday, Aug. 10β€œ005: Nightly from 9 p.m. to 5 a.m. the next day beginning Monday, Aug. 10 to 5 a.m. Friday, Aug. 14, the northbound Interstate 5 off-ramp to northbound Southcenter Parkway (milepost 154) will close for maintenance. The off-ramp to southbound Southcenter Parkway will remain open.”
  • ⚠
    The northbound I-5 off-ramp to Southcenter Parkway will remain closed through 5 a.m. Friday, Aug. 14No usable supporting receipt β€” unverified.
  • ⚠
    The southbound off-ramp will remain open during this timeNo usable supporting receipt β€” unverified.
  • βœ“
    Starting Aug. 17, both directions of SR 169 will close for 35 days between Southeast 332nd Street and Plass Roadβ€œ169: Starting at 12:01 a.m. Monday, Aug. 17, both directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • βœ“
    The closure of both directions of SR 169 is for fish barrier removalβ€œ169: Starting at 12:01 a.m. Monday, Aug. 17, both directions of SR 169 will close between Southeast 332nd Street and Plass Road near Jones Lake for 35 days for fish barrier removal.”
  • βœ“
    Local access and business access will remain open during the closureβ€œLocal access is permitted north and south of the closure, and businesses are open and accessible along SR 169.”
  • βœ“
    Detours will be signed for driversβ€œSeparate signed detours will guide people around the closure.”
  • ⚠
    The I-405 closure from 11:30 p.m. Friday, Aug. 7, to 4 a.m. Monday, Aug. 10, is already underwayNo usable supporting receipt β€” unverified.
  • βœ“
    SR 96 will alternate traffic with flaggers from 7 a.m. to 2 p.m. Monday through Friday, Aug. 10–14β€œDaily from 7 a.m. to 2 p.m. beginning Monday, Aug. 10 to 2 p.m. Friday, Aug. 14, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to Lark Dairy Farm (milepost 6) for utilities work.”
  • βœ“
    SR 96 will alternate traffic with flaggers for utility workβ€œ096: Daily from 7 a.m. to 2 p.m. beginning Monday, Aug. 10 to 2 p.m. Friday, Aug. 14, State Route 96 traffic will alternate with flaggers from East Lowell Larimer Road (milepost 5) to Lark Dairy Farm (milepost 6) for utilities work.”

The Wenatchee Wire is free. Get Wenatchee's news delivered every morning.