WSDOT announced several lane closures and overnight work on Wenatchee-area highways starting this week. The left express toll lane of northbound I-405 will close nightly from August 17 to 21. Southbound I-405 will have up to two lanes closed from August 19 to 21. US 12 over I-5 will have a single lane closed nightly for bridge repairs from August 10 to 20. SR 141 Spur will have alternating single-lane traffic through a work zone from August 18 to 19. Drivers should expect delays and follow detour signs. WSDOT advises travelers to slow down, stay focused, and expect up to 20 minutes of additional travel time in some areas.
WSDOT Closes Lanes on I-405, US 12 for Repairs
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts6 of 7 claims supported Β· 86%
Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β WSDOT announced several lane closures and overnight work on Wenatchee-area highways starting this week.No usable supporting receipt β unverified.
- βThe left express toll lane of northbound I-405 will close nightly from August 17 to 21.β405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21.β
- βSouthbound I-405 will have up to two lanes closed from August 19 to 21.β405: Up to two lanes of southbound I-405 from Coal Creek Parkway Southeast (milepost 9.5) to milepost 8.63 will be closed nightly, 10:30 p.m. Wednesday, Aug. 19 β 5 a.m. Friday, Aug. 21.β
- βUS 12 over I-5 will have a single lane closed nightly for bridge repairs from August 10 to 20.β012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.β
- βSR 141 Spur will have alternating single-lane traffic through a work zone from August 18 to 19.β141SPUNDRWD: Tuesday, Aug. 18 and Wednesday, Aug. 19: Travelers in both directions of SR 141 Spur will take turns moving through a single lane along the White Salmon River between mileposts 6.39 and 6.75 each day from 6 a.m. to 3 p.m., for culvert repair work.β
- βDrivers should expect delays and follow detour signs.βSlow down, stay focused and expect delays.β
- βWSDOT advises travelers to slow down, stay focused, and expect up to 20 minutes of additional travel time in some areas.βSlow down, stay focused and expect delays of up to 20 minutes.β
The Wenatchee Wire is free. Get Wenatchee's news delivered every morning.