← The Wenatchee Wire
Infrastructure

WSDOT Closes Lanes for Maintenance Across Wenatchee

πŸ”Š Listen Β· narrated by Aiden

WSDOT announced lane closures and maintenance work affecting several Wenatchee-area routes starting Aug. 3, 2026. The closures include a right lane closure on northbound SR 522 from 8 p.m. Aug. 5 to 3 a.m. Aug. 6; alternating traffic on SR 508 from milepost 18 to 20 starting Aug. 3; and two lanes of I-90 closing both directions from 8 p.m. Aug. 4 to 3 a.m. Aug. 5. SR 526 will have a right lane closed on eastbound from 9 p.m. Aug. 6 to 5 a.m. Aug. 7. US 101 will have one lane open daily from 8 a.m. to 4 p.m. through Aug. 5 for pavement repair, while SR 211 will have alternating closures from 6:24 a.m. to 9 p.m. Aug. 3. US 2 will alternate traffic nightly from 9 p.m. to 5 a.m. through Aug. 7. Residents should plan for delays, especially during peak travel times, as WSDOT advises using caution and allowing extra time when traveling through affected areas.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 10 claims supported Β· 80%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    WSDOT announced lane closures and maintenance work affecting several Wenatchee-area routesNo usable supporting receipt β€” unverified.
  • ⚠
    The lane closures and maintenance work will start on Aug. 3, 2026No usable supporting receipt β€” unverified.
  • βœ“
    A right lane closure on northbound SR 522 will occur from 8 p.m. Aug. 5 to 3 a.m. Aug. 6β€œ522: From 8 p.m. Wednesday, Aug. 5 to 3 a.m. Thursday, Aug. 6, the right lane of northbound State Route 522 from State Route 202/132nd Avenue to the State Route 9 overpass (milepost 12-13) will close for maintenance.”
  • βœ“
    Alternating traffic on SR 508 will start from milepost 18 to 20β€œMaintenance on SR 508 both directions from milepost 18 near Cinebar Road to milepost 20 near Studhalter Road will be alternating traffic with flaggers. Use caution when approaching the area, beginning at 5:58 am on August 3, 2026 until further notice.”
  • βœ“
    Alternating traffic on SR 508 will start on Aug. 3β€œ508: Maintenance on SR 508 both directions from milepost 18 near Cinebar Road to milepost 20 near Studhalter Road will be alternating traffic with flaggers. Use caution when approaching the area, beginning at 5:58 am on August 3, 2026 until further notice.”
  • βœ“
    Two lanes of I-90 will close both directions from 8 p.m. Aug. 4 to 3 a.m. Aug. 5β€œ090: From 8 p.m. Tuesday, Aug. 4 to 3 a.m. Wednesday, Aug. 5, two lanes of Interstate 90 will close in both directions between Eighth Avenue South (milepost 2) and the floating bridge (milepost 4) for maintenance.”
  • βœ“
    A right lane closure on eastbound SR 526 will occur from 9 p.m. Aug. 6 to 5 a.m. Aug. 7β€œ526: From 9 p.m. Thursday, Aug. 6 to 5 a.m. Friday, Aug. 7, the right lane of eastbound State Route 526 from Evergreen Way to Casino Road (milepost 3) will close for utilities work.”
  • βœ“
    One lane of US 101 will be open daily from 8 a.m. to 4 p.m. through Aug. 5 for pavement repairβ€œMonday, Aug. 3 to Wednesday, Aug. 5: Travelers in both directions of US 101 between milepost 1.0 and Fort Columbia Tunnel (milepost 2.5) will take turns moving through one open lane at a time daily, from 8 a.m. to 4 p.m., for pavement repair work.”
  • βœ“
    SR 211 will have alternating closures from 6:24 a.m. to 9 p.m. on Aug. 3β€œ211: Alternating lane closure on SR 211 in both directions between milepost 5 and milepost 8. Piloted traffic. Expect delays. Beginning at 6:24 am on August 3, 2026 until 9:00 pm on August 3, 2026. Effective: Aug 3, 2026, 6:24 AM Expected end: Aug 3, 2026, 9:00 PM”
  • βœ“
    Alternating traffic on US 2 will occur nightly from 9 p.m. to 5 a.m. through Aug. 7β€œ002: Nightly from 9 p.m. to 5 a.m. the next morning beginning Monday, Aug. 3 to 5 a.m. Friday, Aug. 7, US 2 traffic will alternate with flaggers from Money Creek Campground (milepost 46) to Skykomish east city limits (milepost 49) for utilities work.”

The Wenatchee Wire is free. Get Wenatchee's news delivered every morning.